Progress Above and Below the Deck

Work continues rapidly this week with additional concrete pours scheduled on the deck and garage levels.  Crews work quickly ahead of the pours on the structural steel connections and detailing, installing the metal deck and on the subslab systems.  The deck structure now enables work to continue on both levels simultaneously.  See the pictures below from around the garage construction.

This slideshow requires JavaScript.

Advertisements

Structural Steel Erection

It has been an exciting few weeks on the Charlesview site as the garage structure has been quickly erected.  What a difference two weeks can make at this stage of construction!

This slideshow requires JavaScript.